Skip to content
IT skill · Method· Project Management & Consulting

BPMN freelancers:
What the market really pays and wants.

Demand and trends for BPMN – calculated from 110 real project and job postings of the last 90 days. No survey, no guesswork without data.

As of: week 41/2026 · updated weekly
Listings (90 d)
110
Rank 150 of 531 skills
Trend (90 d)
▼ 6 %
Market share compared with the 90 days before. IT postings overall: ▲ 42 %
Of which must-have
25 %
Rated for 110 postings (AI analysis), otherwise “nice to have”
Remote possible
82 %
13 % fully remote · stated in 94 % of postings
The jury's verdict on BPMN

A shrinking market.

BPMN sits at rank 150 of 531, in the solid middle of demand. Its market share is falling (▼ 6 % vs. the 90 days before).

Solid demandRank 150 of 531 skills, 110 postings in 90 days.
Shrinking marketMarket share ▼ 6 % vs. the 90 days before.
Remote possible82 % of postings allow remote work.
And how does your BPMN profile look?Check it for free

What is BPMN – and why do companies hire BPMN freelancers?

The postings that mention BPMN fall into these types of project (share of the classified postings):

Consulting and design78 %
Consulting, concept work, architecture and project leadership around BPMN.
New development15 %
Building new applications, platforms and products with BPMN.

Typical roles

The roles hired most often are Business Analyst (50 %), Consultant (15 %), Project Manager (9 %) and Software Architect (7 %). Of the postings that state an experience level, 67 % explicitly ask for senior profiles.

Demand over the last 12 weeks

new listings per week
W29W40
▼ 6 %
Market share vs. previous quarter
▲ 34 %
Postings vs. previous quarter
150 / 531
Rank among all skills

Weekly postings for BPMN are rising: from an average of 5 to 12 per week (+145 %). Volume is developing more weakly than the IT market overall (▲ 42 %).

Which skills BPMN is wanted with – and which ones pay off

Jira appears in 39 % of BPMN postings.

Who wants BPMN – and under which conditions

Seniority

Senior67 %
Mid-level28 %

Senior dominates (67 %). Pure junior roles are rare (2 %).

Stated in 99 % of listings

Industries

banking_finance24 %
public_sector22 %
it_software18 %
logistics16 %
manufacturing8 %

banking_finance leads (24 %).

Stated in 77 % of listings

Contract type

Freelance81 %
Permanent12 %
Temp agency7 %

Freelance dominates (81 %).

Stated in 100 % of listings

Workplace

Partly remote69 %
On site18 %
Fully remote13 %

Partly remote dominates (69 %). Anyone working fully remote only reaches 13 % of postings.

Stated in 94 % of listings

Regions (on site)

Frankfurt am Main21 %
Zürich16 %
Bern9 %
Frankfurt7 %
Nürnberg6 %

Frankfurt am Main leads (21 %).

Stated in 81 % of listings

Project language

German91 %
English9 %

German dominates (91 %).

Stated in 100 % of listings

Market dynamics: how contested is BPMN?

Typical duration12 monthsMedian of the postings that state it. 54 % run 12 months or longer.Basis: 35 postings with this information (32 % of all postings).
Full time required65 %Share of postings stating a workload that expect full time.Basis: 46 postings with this information (42 % of all postings).

Who posts BPMN projects

Postings of the last 90 days.

Current BPMN projects

Frequently asked questions about BPMN freelancing

How many BPMN projects are there right now?

In the last 90 days, 110 projects and jobs mentioning BPMN were posted. That is around 9 per week. The market share changed by ▼ 6 % compared with the previous quarter.

Is BPMN still in demand for freelancers?

BPMN ranks 150 of 531 skills.

Are BPMN projects possible remotely?

82 % of BPMN postings allow remote work. 13 % are fully remote.

Which skills should I learn as a BPMN freelancer?

Jira (39 %), Confluence (35 %) and Scrum (28 %) are most often required together with BPMN. What actually pays off for your profile is shown by the free CV check.

Who posts BPMN projects?

The most active recruiter accounts for 19 % of all BPMN postings of the last 90 days.

Methodology: We count IT postings of the last 90 days that mention BPMN. Projects posted several times that are detected as duplicates count once; postings without an assignable IT category are missing, so the figures are a lower bound. The trend compares the share of all IT postings with the 90 days before and only appears with enough comparison data. We do not show figures based on fewer than 30 data points. The rating “must have” or “nice to have” comes from an AI analysis of the posting texts. Distributions only refer to postings that state the respective attribute; we state the coverage alongside. Recruiters are the posters of the listing according to the source, only above a minimum number of postings. An AI assigns the project type and role of each posting from its title, category and skills; the shares are counted postings, not estimates, and only appear with enough classified postings.

Basis: 10,565 IT listings in the window

You now know the BPMN market.
Now let the jury judge your profile.

Your CV against 110 BPMN listings – with findings, strengths and an hourly-rate check.